Tron Wallet by Zerion

Hold TRX and TRC-20 stablecoins in a self-custodial wallet that also covers Ethereum, Solana, and 66 chains in total.

  • Self-custodial
  • Ledger support
  • iOS and Android
Tron logo

Tron in a self-custodial wallet

Zerion tracks Tron the same way it tracks every other network it supports — automatically, and without giving up your keys.

Mainnet
Network status
3s
Block time
728126428
Chain ID

What is a Tron wallet?

A Tron wallet manages TRX and TRC-20 tokens — most importantly USDT, which settles more volume on Tron than on any other network. Zerion is a self-custodial Tron wallet: your keys stay with you, and Tron sits alongside 65 other chains in one portfolio.

First-class support for Tron

Buy, send, and track TRX and TRC-20 stablecoins from a wallet you fully control.

The buy flow in Zerion Wallet, choosing a fiat currency from a searchable list
Buy TRX and USDT

Pay by card or Apple Pay, in any currency.

Sending USDT on Tron in Zerion Wallet, with the saved recipient, amount, and network fee shown before signing
Send TRC-20 USDT

Save addresses. Send in a few taps.

The wallet switcher in Zerion Wallet listing Solana, Tron, and EVM addresses with their balances
Tron, Solana, and EVM in one app

Every address you own, in one portfolio.

Built into
your browser.

One extension for every onchain app. Or the full web app, in any browser.

Self-custodial by design.
Ledger support for extra safety.

Zerion web app preview

How to use Zerion on Tron

No RPC settings, no network to add by hand.

  1. 1

    Install Zerion

    Get the app on iOS or Android, or add the browser extension. Import an existing wallet or create a new one in seconds.

    Get the app
  2. 2

    Bring assets to Tron

    Bridge or receive assets on Tron. It's enabled by default — there's nothing to configure first.

  3. 3

    Everything appears on its own

    Tokens, DeFi positions, and NFTs on Tron are found, priced, and added to your portfolio automatically.

Any token

Every Tron token, added automatically

Your Tron balances appear on their own — no contract addresses to paste, no token lists to import.

  • New tokens show up as soon as they land in your wallet
  • Live prices and per-token profit and loss
  • Tron sits alongside your other 65 chains in one portfolio
Zerion Wallet token list — balances across all networks with live prices and 24-hour change

DeFi positions

Your Tron DeFi, found for you

LPs, staked assets, lending positions, and unclaimed rewards across 4,500+ protocols — detected and valued without any setup.

  • Liquidity pool and staked positions with current value
  • Debts and rewards included, not just token balances
  • Group your holdings by protocol
Zerion Wallet holdings grouped by protocol, with an Aave V3 lending position and its value

Swap & bridge

Bridge and swap in one go

Routing across DEXes and aggregators finds the best available price, and moves value onto or off Tron in a single flow.

  • Best rates sourced across multiple liquidity venues
  • Bridge to and from Tron without a separate bridge app
  • See the outcome before you sign
Zerion Wallet swap screen — ETH to USDT with the network fee, slippage, and routing provider shown before signing

History & NFTs

Transaction history you can read

Every Tron transaction in one decoded feed, in plain language rather than raw calldata — with your NFTs in the same wallet.

  • Tron activity in the same feed as every other chain
  • Swaps, bridges, approvals, and mints, labelled
  • NFTs on Tron added automatically
Zerion Wallet history tab — sends, receives, and trades across every network, each labelled in plain language

What is Tron (TRX)?

Tron is a decentralized blockchain platform built for digital content and entertainment, connecting creators and audiences directly over peer-to-peer technology.

TRX is Tron's native cryptocurrency, used for transactions, staking, and powering smart contracts. The network runs on Delegated Proof-of-Stake, where TRX holders vote for Super Representatives who validate transactions and secure the chain.

Tron supports high throughput at low fees, which is why it became a default home for stablecoin transfers, USDT-TRC20 in particular, as well as DeFi and consumer apps.

Tron's fee model is unusual: transactions consume bandwidth and energy, earned by staking TRX or paid in TRX. A TRC-20 USDT transfer burns roughly 6–13 TRX unless the sender stakes for energy — yet Tron still settles more USDT than any other network, because the rail is fast, final, and universally supported.

Security you can verify

Don’t trust. Verify. Independent audits and open code, both public.

Audit that you can trust

Independent firms audit every Zerion release. The reports are public.

Read the audits →
Secfault SecurityZokyoCure53SlowMist
Zerion Wallet

Create your wallet

Self-custodial, multichain, and built for everything onchain — Tron included.

Get Zerion Wallet →
Zerion API

Building on Tron?
Try the Zerion blockchain API

Balances, positions, and decoded history across 42 chains — one API call, no indexing.

Start building →
Uniswap
OpenSea

FAQ

Tron questions we get asked most.